Westside Rebuild Tracker: LADBS permits since the January 2025 fires

Every new-home building permit filed with the Los Angeles Department of Building and Safety in Pacific Palisades, Brentwood, Bel Air / Beverly Crest and Encino / Tarzana since 2025-01-08, by month, status and declared construction type. Rebuilt every Monday from the City's open data.

Data retrieved 2026-10-26 · next refresh Monday 05:30 UTC
2,816
New 1–2 family permits filed
2,305
In Pacific Palisades (90272)
1,843
Issued or completed
0.4%
Declared non-combustible (Type I/II)

21 months after the Palisades Fire, the rebuild is visible one permit at a time. This page counts them, and shows what the permits themselves say about how the Westside is being rebuilt.

Chart: new-construction permits submitted per month by area, permit status pipeline, and declared construction type — LADBS open data, retrieved 2026-10-26

What the permits say

Of the 2,816 new 1–2 family building permits filed in the four areas since 2025-01-08, 1,857 carry the LADBS "2025 wildfire rebuild" work description, almost all of them in Pacific Palisades. 1,761 permits are issued and presumably under construction, 82 have reached a Certificate of Occupancy or final, and 969 are still in plan check or verification.

On construction type, the permits are explicit. Where a type is declared, 99.4% (2,601 permits) are Type V, the wood-frame category, and 0.4% (11) are Type I or II, the non-combustible category that covers reinforced concrete and steel structures. We publish this share without editorial spin: it is the clearest public measure of how much of the Westside is being rebuilt with the same structural logic as before.

By area

AreaPermitsIn plan checkIssuedCompletedWildfire rebuildNon-combustibleMedian days to issueMedian sq ft (SFD)
Pacific Palisades
ZIP 90272
2,3057011,532681,8578 (0.3%)1013,551
Brentwood
ZIP 90049
1396471400 (0.0%)1335,114
Bel Air / Beverly Crest
ZIP 90077, 90210
1088324103 (2.8%)1646,722
Encino / Tarzana
ZIP 91316, 91356, 91436
264121134900 (0.0%)1284,208

Status of all permits

StatusPermitsShare
In plan check96934.4%
Issued (under construction)1,76162.5%
Completed (CofO / finaled)822.9%
Withdrawn / inactive40.1%

Declared construction type

Construction type (California Building Code)PermitsShare
Type V (wood-frame)2,60192.4%
Type I/II (non-combustible)110.4%
Type III/IV (mixed / heavy timber)40.1%
Not stated2007.1%

Type V-A and V-B are wood-frame; Type I and II are non-combustible (concrete, masonry, steel); Type III/IV are mixed or heavy-timber assemblies. The type is declared by the applicant on the permit and is not verified by us.

Permits by month

MonthPacific PalisadesBrentwoodBel Air / Beverly CrestEncino / TarzanaSubmittedIssued
Oct 2026323033873
Sep 202693148106121
Aug 202699717913284
Jul 20261267413150135
Jun 20261068017131126
May 202694651111696
Apr 20261245012141104
Mar 20261179820154150
Feb 2026829411106128
Jan 2026101026109126
Dec 202521213421250137
Nov 202514566916686
Oct 202515614116187121
Sep 20251506318177111
Aug 2025152821317589
Jul 20251441171117368
Jun 2025124531614851
May 202592117711739
Apr 20256247168910
Mar 202539347533
Feb 2025463613682
Jan 202590147300

"Submitted" is the month the application was filed; "Issued" the month the permit was granted (all areas). The current month is partial.

Tracker history

Each weekly refresh adds a row, so the pipeline can be read over time.

SnapshotPermitsIn plan checkIssuedCompletedNon-combustible
2026-09-162,7191,0121,6406411
2026-09-212,7191,0121,6406411
2026-09-282,7451,0131,6636511
2026-10-052,7619941,6996511
2026-10-122,7789951,7067311
2026-10-192,8069941,7268011
2026-10-262,8169691,7618211

Method

Limits

Malibu is not here. Malibu is an incorporated city with its own building department; its permits are not in LADBS data. The same applies to Topanga and other unincorporated areas handled by Los Angeles County, and to the City of Beverly Hills proper (only the City of Los Angeles part of ZIP 90210 appears).

A permit is not a house. A submitted permit may be revised, withdrawn or never built; an issued permit marks the start of construction, not its end. Several permits can refer to one lot (main house, ADU, garage).

Construction type is self-declared on the application and can change at plan check. We report it as filed.

The current month is incomplete, and the portal's weekly refresh may lag City records by several days.

Download, cite, embed

Download CSV Download JSON Download chart (PNG)

Cite (APA)

My Villa. (2026). Westside Rebuild Tracker: LADBS new-construction permits after the January 2025 fires [Data set, retrieved 2026-10-26]. Los Angeles Open Data, City of Los Angeles Department of Building and Safety. https://myvilla.la/research/westside-rebuild-tracker.html

Embed the chart

<a href="https://myvilla.la/research/westside-rebuild-tracker.html"><img src="https://myvilla.la/research/img/westside-rebuild-tracker.png" alt="Westside Rebuild Tracker — LADBS new-home permits since January 2025 (My Villa)" width="1200" style="max-width:100%;height:auto"></a>
<p>Source: <a href="https://myvilla.la/research/westside-rebuild-tracker.html">Westside Rebuild Tracker</a> by My Villa, from City of Los Angeles / LADBS open data. Updated 2026-10-26.</p>

License and attribution

The underlying permit records are public data of the City of Los Angeles, Department of Building and Safety, published on data.lacity.org and used under the portal's terms of use. Our aggregation, chart and page are released under CC BY 4.0: reuse freely with a link to this page.

Provided "as is", without warranty of any kind. My Villa is not affiliated with the City of Los Angeles. Counts may change as LADBS updates its records; please cite the retrieval date.